ProcessWeave Studio

Purpose

Process Analysis has one master switch and five technique switches: Flow Analysis, Little's Law, Capacity Planner, Token Game and Queueing Analysis. They live in one card in Administration, Settings. Only Administrators can change them.

Stored setting versus what users get

  • Each switch stores its own on or off value. The master switch decides whether any of them takes effect.
  • A technique is available to users only when the master is on and its own switch is on. Users also still need their normal access to the process: the switches never grant access.
  • Turning the master off hides Process Analysis for everyone and keeps every technique's own value, so turning it on again brings back exactly what was on before.

Turn on one technique

  1. Open Administration, then Settings, and find the Process Analysis card.
  2. Tick the master switch and the one technique you want, then choose Save Process Analysis settings.
  3. Users now see Process Analysis in the left menu with that technique under it. Techniques that are off do not appear in the menu or on the Process Analysis page.

Turn on all techniques

Tick the master switch and all five technique boxes, then save. The menu lists Flow Analysis, Little's Law, Capacity Planner, Token Game and Queueing Analysis in that order. If the master is on and no technique is ticked, ordinary users see no Process Analysis entry; the Settings card stays available to you.

Turn a technique off

  • The menu entry and the technique's pages and actions stop working immediately. A Token Game that is open stops with a message at its next move.
  • Nothing is deleted: scenarios, results and stored Flow Analysis inputs stay in place and work again as soon as the technique is turned back on.

Flow Analysis and upgrades

Flow Analysis keeps its one existing setting; it is now the Flow Analysis box in this card. When this version was installed, an installation where Flow Analysis was already on kept it on (the master was set on so nobody lost access), and Little's Law, Capacity Planner, Token Game and Queueing Analysis started off. An installation where Flow Analysis was off started with everything off.

Saving and history

All five values are saved together or not at all. Each value that changed is recorded in the activity log with who changed it, when, and the old and new value. Saving without changing anything records nothing.

These switches control availability only. They do not run any analysis, change any BPMN model, or give anyone access to a process.